Welcome to the Official Construction Blog of the Pilsener Haus and Biergarten which is located in Hoboken, NJ on the corner of 15th and Grand street... Be sure to check back periodically for updates!

Wednesday, January 5, 2011

Construction Blog #3

Happy New Year from everyone at the Pilsener Haus and Biergarten! We hope that everyone had an exciting and festive holiday season and is excited for 2011; we sure are.

As the calendar was changing from December to January the site of the Pilsener Haus and Biergarten was going through many changes of its own. As you will see below in the third installment of the Construction Blog, there are many noticeable and exciting developments over at 1422 Grand Street.

The Building

Over the course of the past few weeks many parts have gotten delivered that aren’t necessarily being installed right away, but will be needed in the coming weeks. They are currently a few doors down in storage while the rest of the construction prepares for them.
The motor for the new elevator which will need a crane to be lifted into place on the roof

New pump for the sprinkler system which will be housed on the first floor


























Another major development is that all of the central duct work has been installed on floors two to four. The duct work will be for all of the ventilation as well as air-conditioning. These main ducts are housed in the back wall of the mechanical closest on each of the upper floors.
All of the addition ducts for the bathrooms and rental spaces will branch off of this main chase.
The elevator company has also installed the new elevator doors on all floors except for the main Biergarten level. These are the finished products and, besides the windows, are the first pieces that have a final finish on them; most of the work done on the job so far has been either a base or sub-layer.

The masons helped by closing off most of the elevator door assembly, leaving only a small space on the left side for the electric push-button connection

Sprinkler and Main Mechanical Room

This area will be located towards the main building entrance and secondary Biergarten entrance (the Main Entrance for the Biergarten will be through the Wintergarten area on 14th street). This floor was poured around the same time as the stairs leading out to the Wintergarten, but the framing for this area was completed in the days leading up to Christmas.
The old pipes on the left hand side of the picture will be moved into the encased closet with the new pump system.
Wintergarten

This has also gone through significant changes since my last entry. During the last update, the rebar construction for the Wintergarten floor had just been completed. Now, the cement floor has been poured and the walls have been erected even higher and are approaching their final height.

Here is a short video of the Wintergarten area from the fourth floor with some of the masons making an appearance.

The steel archways for the Wintergarten have also been delivered and are being stored in what will eventually be the “beer cooler” area in the back of the kitchen. The archways will be completed by the same team of workers who installed the custom smoked-glass, steel-frame windows for the Biergarten.

Kitchen

The concrete floor was poured right after Christmas and the initial duct work as began to take shape up in the ceilings for the cook-tops and grill.

Bathrooms

The bathrooms for the Biergarten have begun to take shape. The concrete floors were poured the same day as the kitchen was and the walls have started to rise in both the men’s and women’s rooms.



Main Dining Area

The moment that everyone has been waiting for, the initial construction of the bar has begun! The bar will be pretty much half the length of the back wall (as you can see below). It goes from the Wintergarten stairs all the way to the very back wall, which buts up against the electrical room.
In this picture you can also see that the ceiling as been spackled (the white dots and lines) as well as had some small soffits framed out (upper left side) along the back wall for wiring purposes

Please feel free to fill the comment section below with any questions you might have (which I will try answer in the following entry) as well as ideas for what you readers would like updates on.

We hope everyone has started off 2011 on the right foot and good luck with all those New Years Resolutions!

Check back soon for more updates!

4 comments:

  1. When are ya'll fixin' to pour your first pint?

    ReplyDelete
  2. Seriously, compare yourself to Zeppelin because we've all been a little let down by their offerings. Does your model support local/craft breweries OR are you offering only Europe? will you be offering what we're all coming out for? founders, sierra, dogfish, allagash dot dot dot ya know, like Andy's or Coppermine, there's not many.

    ReplyDelete
  3. Matt- First, thank you for taking the time to read my blog and your interest in the PH&B... We don't have a set opening date as of just yet, but we're still pushing for our first pint in the early spring... As for the beers and the comparison to Zeppelin, I will have to talk with the two owners for that information because I am not too sure. I will try and have that for you in the next entry.

    Cheers

    ReplyDelete